SAF Certification Schemes: Which Certificate Your Offtaker Actually Asks For

10 min read  ·  Nov 2, 2026  ·  By Alex

saf certification schemes

Your offtaker asks for a document, not a principle. The fuel arrives with a proof that has to match the obligation it covers. A proof of sustainability (PoS) issued under ISCC CORSIA or RSB ICAO CORSIA answers CORSIA. Meanwhile, a proof of sustainability under ISCC EU or RSB EU RED answers the EU rules (IATA). So the scheme I pick follows from the claim my buyer must report. That is sustainable aviation fuel evidence in one line. In addition, the whole of SAF certification turns on it: one obligation, one certificate family.

I write this from the developer side of the table, where the file has to survive an offtaker’s legal review. Also, an auditor’s sampling in the same month. The question is rarely whether certification matters, and almost always which of the two scheme families answers the obligation on the contract.

In short

  • CORSIA: a PoS under ISCC CORSIA or RSB ICAO CORSIA answers CORSIA obligations (IATA).
  • EU: a PoS under ISCC EU or RSB EU RED answers EU ETS obligations (IATA).
  • Scope: a certification body, the independent auditor named on the certificate, checks the operator’s site and the batch’s path (IATA).
  • Reciprocity: ISCC and RSB recognize each other’s compliance schemes, but not their voluntary ones (IATA).
  • Risk: an uncertified batch counts as a fossil fuel (Dutch Emissions Authority).
Facebook
Twitter
LinkedIn

In this article

The short answer: your buyer buys a document

A sustainability certification scheme is a set of published rules. In addition, the certification body is the independent auditor that checks an operator against them. ISCC runs three schemes: ISCC CORSIA, ISCC EU and ISCC PLUS. RSB runs three more: RSB ICAO CORSIA, RSB EU RED and RSB Global (IATA). The document that moves down the chain is the PoS, issued for one batch and showing the chain of custody, which is the recorded path of that batch from feedstock to delivered fuel. Airlines require their SAF suppliers to provide a PoS for the batch purchased, and that PoS is the supporting documentation for claiming the environmental attributes (IATA). Also, airlines as end users need no certification themselves (IATA). Six scheme names, two families, one document.

What this means for you: I never ask a supplier for a certificate before I know which of the six names the contract will accept. The scheme cannot reissue the wrong family once the batch has flown and been reported.

The obligation decides the certificate

The obligation decides the certificate, not the logo on the plant gate. A PoS under ISCC CORSIA or RSB ICAO CORSIA covers claims against CORSIA emissions obligations. In addition, a PoS under ISCC EU or RSB EU RED covers claims against EU ETS emissions obligations (IATA). CORSIA is the Carbon Offsetting and Reduction Scheme for International Aviation: its voluntary pilot phase ran from 2021 to 2023, its voluntary phase runs from 2024 to 2026. In addition, its mandatory stage begins in 2027 (4AIR). A fuel that clears the rule is a CORSIA eligible fuel. This means the fuel needs certification by an ICAO approved scheme. An accreditation body is the organisation that approves those certification bodies. Also, uncertified fuels count as fossil fuels (Dutch Emissions Authority).

What this means for you: I write the obligation into the offtaker term sheet in plain words before I approach a certification body. This happens because a scheme chosen for a voluntary claim will not survive a CORSIA verification.

What the scheme actually tests

Lifecycle emissions are the greenhouse gases counted across the whole life of the fuel, from feedstock to combustion, and the criteria behind a CORSIA eligible fuel turn on that number. The fuel must generate at least 10 percent less greenhouse gas emissions on a lifecycle basis than conventional fossil Jet A, while most advanced biofuels today offer about 70 to 80 percent (4AIR). Also, the feedstock must not come from biomass obtained from land converted after 1 January 2008 that was primary forest, wetlands or peat lands (4AIR). Two lifecycle values exist: ICAO default emission values by feedstock and conversion process, or a specific calculation using ICAO methodology.

In addition, the certifying scheme is responsible for the value (4AIR). From 1 January 2024 further criteria apply. This covers water, soil, air, conservation, waste and chemicals, labour rights, water use rights, local and social development, and food security (4AIR).

What this means for you: I ask the certifying scheme which route it will use for my batch before I sign. This happens because a default value and a specific calculation can produce two different documents for the same litre.

Who has to be certified, and who does not

Certification attaches to an operator and a defined scope, not to a brand on a gate. The operator applies or registers as a system user with the scheme. In addition, an independent certification body audits it against a defined scope and chain of custody (IATA). Group certification can cover a single site or several sites within the same supply chain (IATA). ISCC and RSB recognize each other’s CORSIA and EU RED compliance certification. Therefore, the next operator in the chain can accept material from a site certified under the other scheme. However, they do not recognize each other’s voluntary schemes, ISCC PLUS and RSB Global (IATA).

In book and claim systems, the sustainability characteristics of certified material are booked into a registry and transferred separately from the physical fuel. Therefore, the buyer never touches the batch itself. The economic operator booking those characteristics into the registry needs to hold certification (IATA).

What this means for you: I map every site, blender and registry entry before the first audit. This happens because a scope that misses one link breaks the batch even when the fuel itself is compliant.

The EU door and the cost of the paperwork

ReFuelEU Aviation has sharply increased costs amid limited SAF capacity, and airlines in Europe pay up to five times more than the price of conventional jet fuel and double the market price of SAF, without guarantee of supply or consistent documentation (IATA). The SAF premium translated into an additional USD 3.6 billion in fuel costs for the industry in 2025, and airlines paid a premium of USD 2.9 billion for the 1.9 Mt available, of which USD 1.4 billion is the standard premium over conventional fuel (IATA). Only certified CORSIA eligible fuels count, and the operator must keep the certificate for the verifier (Dutch Emissions Authority).

What this means for you: I price the certificate into the offtaker’s landed cost before I sign. This happens because the document is part of the delivery obligation.

Three ways the certificate fails to serve the contract

I have seen a certificate that was valid, current and still useless to the contract. The scheme does not cover the claim you need, because a voluntary scheme PoS does not answer CORSIA. Also, the scope does not cover the site that produces the fuel. Also, the chain of custody breaks between the producer and the blender. Therefore, the batch identity disappears (IATA, Dutch Emissions Authority). Operators must also confirm that no other scheme claims the same fuel batches (Dutch Emissions Authority). There is a narrower door: RSB lets an operator certify for CORSIA eligibility only, which proves the two CORSIA criteria, greenhouse gases and carbon stock, but carries only the CORSIA claim. Also, none of the additional sustainability claims of full RSB CORSIA certification (RSB). ICAO recognised the RSB CORSIA standard in December 2020 (RSB).

What this means for you: I check the claim, the scope. Also, the custody links against the contract clause by clause before I book the audit. This happens because each one is a separate way to lose the batch.

The order I would run the work in

I would run the work in this order. First I ask the offtaker which obligation the volume has to cover, then I choose the scheme family from that answer, then I pick the certification body. Also, the scope, then I run the chain of custody design before the first audit, and only then do I price the annual surveillance and the PoS administration for the life of the contract. I would keep a second door open for the voluntary market, where ISCC PLUS. Also, RSB Global are separate from the regulatory schemes and are not interchangeable (IATA). Neither of those voluntary certificates answers a regulatory claim, and neither answers the other (IATA). The EU carbon intensity file follows the same order. In addition, I set out that sequence at EU compliance and carbon intensity.

What this means for you: I sequence the file this way because each step narrows the next choice. In addition, a change of scope after the audit starts usually adds a second audit. It runs before the scheme issues the first certificate.

How I would run this if it were my file

I would map every claim I intend to make, CORSIA, EU, corporate Scope 3, to the PoS that evidences it (IATA, Dutch Emissions Authority). Also, I would model the demand side with the published volumes. SAF production in 2025 was 1.9 Mt, only 0.6 percent of total jet fuel consumption. For 2026 the projection is 2.4 Mt and 0.8 percent (IATA). I would treat the offtake as the constraint. This happens because demand should reach 17 million tonnes per annum by 2030. Meanwhile, only three airlines consumed over 1 percent of SAF in their fuel mix in 2023 (World Economic Forum with Kearney).

Installed SAF capacity reached 4.4 Mt by end 2024, with 6.9 Mt of expansion planned. Therefore, the constraint I can act on sits in the offtake, not in the capacity table (World Economic Forum with Kearney).

What this means for you: I keep the claim map, the volume model and the offtake in one file. This happens because the certificate is only worth the batch, the obligation and the signature behind it.

Sources

Frequently asked questions

The offtaker needs a proof of sustainability issued under a CORSIA approved scheme, ISCC CORSIA or RSB ICAO CORSIA, plus the CORSIA sustainability certificate that the scheme issues for the batch, and the operator must declare that the same batch is not claimed under any other scheme (IATA, Dutch Emissions Authority). The scheme issues a CORSIA Sustainability Certificate for the batch, which the aircraft operator submits to the verifier (Dutch Emissions Authority). Airlines require their SAF suppliers to provide a PoS for the batch purchased (IATA).

They are two different standard holders: ICAO has approved two accredited pathways for CORSIA SAF certification, ISCC and RSB, each with its own scheme names, and ISCC and RSB recognize each other’s CORSIA and EU RED compliance certification but not each other’s voluntary schemes (IATA, 4AIR).

The plant, or the relevant economic operator in the chain, holds the certification for its scope and chain of custody, while airlines as end users are not required to be certified under the sustainability certification schemes (IATA). The operator registers or applies as a system user and is audited by an independent certification body (IATA).

An uncertified fuel is treated as a fossil fuel for CORSIA purposes, so the operator cannot claim the emission reduction and must supply the certification document before the claim is reported (Dutch Emissions Authority). Only certified CORSIA eligible fuels count, so the batch stays outside the claim until the certificate exists.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

Once you fix the scheme family and the scope, the file usually needs capital as much as it needs paperwork. The obligation that paperwork answers is set out at EU ETS aviation. In addition, I take that file to capital for pre-FID sustainable aviation fuel developers in Southeast Asia who can show the obligation, the scope. Also, the chain of custody their offtaker asked for.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch