Aligning Green and Shariah Taxonomies for SAF Finance: Two Filters, One Dossier

9 min read  ·  Jun 2, 2026  ·  By Alex

shariah green taxonomy alignment

A sustainable aviation fuel financing has to clear two independent tests before an investor will price it. One judges whether the activity is environmentally eligible, the other judges whether the contract and the asset behind it are permissible. Neither replaces the other, and running them in the wrong order makes you pay twice for the same dossier. That is why I treat a green taxonomy, a classification system that sorts economic activity by environmental merit, and a Shariah screen, the permissibility test a board of Islamic scholars applies to the contract and the asset, as stacked filters rather than rivals: Islamic finance for SAF keeps confirming that conclusion.

The friction sits in the definition of the activity and in the way returns are generated, not in the intention behind the project. For a structurant pre-FID in Southeast Asia the real question is never which filter matters more, it is what each one tests and where the two collide inside a single instrument.

In short

  • They stack: The two filters pass the same file, and neither one certifies the other.
  • Green side: Eligible activity against environmental objectives and essential criteria, ending Green, Transition or Unqualified.
  • Shariah side: Contract form, asset pool and return formula, screened for interest, uncertainty and speculation.
  • Collision point: A use of proceeds, meaning where the raised money goes, can pass while the asset behind it does not.
  • Order: Screen the asset first, classify the activity second, then report once for both.
Facebook
Twitter
LinkedIn

In this article

The short answer: they do not compete, they stack

A green taxonomy tells you whether the activity is environmentally eligible. A Shariah screen tells you whether the contract and the asset are permissible. A SAF financing has to clear both before an investor sees it (ICMA, Islamic Development Bank and LSEG; OJK).

The two tests are asked of different objects. One asks what the money funds, the other asks what the investor owns and how that ownership produces a return, so a clean result on the first says nothing about the second. The taxonomy answer lives in a framework document confirmed by an outside review, the Shariah answer lives in board approval of the documentation and of the asset pool.

In my file work the friction sits in the definition of the activity and in the way returns are generated, not in the intention behind the project. That is the whole Shariah green taxonomy problem: two legitimate standards, one dossier, and no authority that signs for both.

What this means for you: I would not run the two reviews as alternatives, because nothing you file with one reviewer is read by the other. I would hand both reviewers the same asset list and the same activity list from week one, so the two approvals describe one transaction instead of two versions of it.

What each filter actually tests

On the green side, a taxonomy classifies an economic activity against environmental objectives, meaning the environmental goals the framework exists to serve, and then applies essential criteria. Indonesia’s version 2 sets four environmental objectives and three essential criteria: do no significant harm, meaning no significant damage to another environmental goal, remedial measures to transition, and the social aspect (OJK). The activity is then classified Green, Transition or Unqualified.

On the Shariah side the test is about the contract and the asset: the instrument must avoid riba, meaning interest charged on money as money, gharar, meaning excessive uncertainty, and maysir, meaning speculation on chance outcomes. It must rest on real economic activity and carry a negative screening, a list of excluded sectors covering alcohol, gambling, adult entertainment and weapons (Dentons; ICMA, Islamic Development Bank and LSEG). Sukuk certificates evidence an ownership interest in the underlying asset rather than a debt the issuer owes, and that difference is what a Shariah board reads first (Latham and Watkins). The green eligibility test for your own project sits with the rest of your sustainability file: SAF sustainability criteria.

What this means for you: I would write the two tests as separate questions inside one workplan, because they are answered by different people holding different documents.

Where the two screens disagree

On the green side the frame judges use of proceeds. Under a framework strictly aligned with the Green Bond Principles the environmental credentials of the asset inside the special purpose vehicle are not assessed, only where the money goes, which can let a non-green asset back the instrument. An ijara structure, a lease of the usufruct of tangible assets, can therefore raise capital for new projects from existing assets while the asset itself is never tested (UNDP and Kuwait Finance House).

On the Shariah side the frame judges the asset and the contract form. Documentation must be approved by a Shariah board of Islamic scholars with financial acumen, a sufficient amount of Shariah-compliant assets must underpin the structure, and those assets are typically of at least equal value to the principal amount being raised, or at least 51 percent of the portfolio value in hybrid structures (ICMA, Islamic Development Bank and LSEG).

The two tests can therefore pass different assets inside the same structure: the money is legitimately applied while the certificates rest on something the green side would never classify Green, or the activity is Green while the contract form fails the board.

What this means for you: I would carry the asset pool and the use of proceeds as two separate line items in the same file, because a pass on one of them tells you nothing about the other.

What the regional machinery already gives you

The ASEAN Green Bond Standards are aligned with the ICMA Green Bond Principles, cover green bonds and green sukuk, and list fossil fuel power generation projects as ineligible (ICMA, Islamic Development Bank and LSEG).

Indonesia’s taxonomy takes the ASEAN taxonomy and national policy as its primary references and states interoperability, credibility and inclusivity as its principles, on a living document approach. Version 2 extends coverage from Energy into Construction and Real Estate, Transportation and Storage and some agriculture, forestry and land-use activities, and it introduces the adoption of sustainable aviation fuel in accordance with the Ministry roadmap, staying aligned with Indonesia’s Nationally Determined Contributions (OJK).

On the Shariah side, the joint guidance from ICMA, the Islamic Development Bank and LSEG came from a collaboration announced at COP28 in the United Arab Emirates in December 2023. Maqasid al-Shariah shows conceptual alignment with environmental, social and governance goals, and studies find that Islamic financial institutions with stronger Shariah governance tend to display higher ESG scores (ICMA, Islamic Development Bank and LSEG; Dentons).

What this means for you: I would build the framework against the ASEAN references and the national taxonomy together, then lay the Shariah guidance on top, because those documents already speak in the same eligible categories.

Why the demand side cares

Aviation carries a collective long-term global aspirational goal of net-zero carbon emissions by 2050 adopted by ICAO, and IATA has committed its member airlines to net-zero emissions from operations by 2050, aligned with the 1.5 degree target of the Paris Agreement. That commitment assumes the majority of aviation’s decarbonisation comes from sustainable aviation fuel (Dentons).

CORSIA operates as a global market-based mechanism requiring airlines to purchase eligible carbon credits to offset growth in emissions above a baseline linked to 2019 levels (Dentons). Etihad Airways showed the shape of the answer in 2020 with a USD 600 million transition sukuk, the world’s first sustainability-linked sukuk, carrying a 20 percent emissions-intensity target for 2025 and a 50 percent net-emissions target for 2035.

Mandates and compliance rules are what give the eligible activity a buyer, and I read them from SAF mandates before any structure is chosen. The environmental claim on the fuel then has to be assigned once and only once, which is the discipline that sits behind CORSIA and every offset-linked term.

What this means for you: I would confirm the buyer of the claim before I confirm the structure, because a taxonomy classification that no mandate, no compliance mechanism and no airline target needs will not move a pricing grid.

Cost, process and the double dossier

The extra layer has a price on both sides. Issuance expenses rise with external certification and reporting mandates, and the barriers recorded for this market include the absence of a clear taxonomy, lack of standardised regulation, transparency and reporting challenges, greenwashing risks and limited investor awareness of sukuk and sustainability principles (UNDP and Kuwait Finance House).

The review itself takes time: eligible project categories are defined, an external review is obtained before issuance, most commonly a second party opinion, an independent alignment opinion published before the deal, then proceeds are tracked and allocation and impact are reported annually (ICMA, Islamic Development Bank and LSEG). On the Shariah side, scholars have limited experience of environmental, social and governance issues and no clear directives to evaluate them, and the same study suggests AAOIFI should lead on guidelines for scholars (UNDP and Kuwait Finance House).

The reward on the green side is the greenium: in 2020 the National Mortgage Corporation of Malaysia issued a 3-year sustainability SRI sukuk that priced 2 basis points below its non-SRI sukuk (UNDP and Kuwait Finance House).

What this means for you: whether running two filters buys a cheaper stack or only a wider investor base is the bankability question I would answer before the framework is drafted and the fees are committed.

The order I would run the screens in

The sequence matters more than either test in isolation, and this is the order I would run on a pre-FID file.

  • First: run the Shariah screen on the asset and the contract form, because it can kill a structure before the board ever meets (ICMA, Islamic Development Bank and LSEG; Latham and Watkins).
  • Second: run the green taxonomy on the activity, because that is where Green, Transition or Unqualified is decided (OJK).
  • Third: map both results onto the same document set, so the framework and the Shariah approval describe the same assets (ICMA, Islamic Development Bank and LSEG).
  • Fourth: write the reporting once, in a form both reviewers can sign (UNDP and Kuwait Finance House).
  • Fifth: put the combined framework through green bond standards verification before it reaches the people who place it.

What this means for you: the order is the saving. A structure that fails the board never reaches the taxonomy question, and a file that reaches both reviewers in one shape costs one reporting cycle instead of two.

How I would run this if it were my file

The two screens are not difficult alone. Holding both inside one file without letting either answer drift is.

  • I would list the eligible activities and the permissible assets on the same page, side by side (OJK; ICMA, Islamic Development Bank and LSEG).
  • I would test the asset pool honestly, including the 51 percent tangible asset threshold where the structure is hybrid (ICMA, Islamic Development Bank and LSEG).
  • I would test the return formula against riba, gharar and maysir before pricing (Latham and Watkins).
  • I would check the environmental claim for double counting before I let it into the marketing (Dentons).
  • I would remember that both filters answer the same investor question: does the money reach real economic activity with a claim that holds.

What this means for you: I would put the two lists side by side before the term sheet is written, because every later choice, the structure, the KPIs, the reporting calendar, is cheaper to change at that point than after a Shariah board has read a draft.

Sources

Frequently asked questions

No, because they test different objects. The taxonomy classifies the activity and ends in Green, Transition or Unqualified, while Shariah approval covers the documentation, the contract form and the pool of permissible assets held under the certificates (OJK; ICMA, Islamic Development Bank and LSEG).

Yes, and it happens in both directions. Under a frame aligned strictly with the Green Bond Principles the environmental credentials of the asset inside the special purpose vehicle are not assessed, only the use of proceeds, so a non-green asset can back an instrument whose documentation still passes its Shariah review, and an activity can be classified Green while its contract still carries riba or gharar (UNDP and Kuwait Finance House; Latham and Watkins).

One disclosure pack with two readings: a framework that states the eligible project categories, the tracking of an equivalent amount of net proceeds and annual allocation and impact reporting, plus documentation approved by a Shariah board and an asset pool of at least equal value to the principal, or 51 percent of the portfolio in hybrid structures (ICMA, Islamic Development Bank and LSEG).

It adds process rather than a second instrument. Issuance expenses rise with external certification and reporting mandates, and the recorded barriers include the absence of a clear taxonomy, limited investor awareness and scholars with limited environmental, social and governance experience, so the cost sits in review time, board time and reporting (UNDP and Kuwait Finance House).

Want the two taxonomy screens run against your file?

A short call is usually enough to see where your project stands.

If you are pre-FID and want a reader for the combined file, that is where I come in: I take the two lists, the framework draft and the board comments and turn them into one document set for the people who place it, through investor introductions.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles