Home » Islamic Finance for SAF Projects in Malaysia: Where the Capital Actually Sits
Islamic Finance for SAF Projects in Malaysia: Where the Capital Actually Sits
10 min read · Jun 2, 2026 · By Alex
If you are developing a sustainable aviation fuel project in Malaysia, you may ask who finances it through Islamic channels. The answer is four places at once: local Islamic banks and their Islamic windows. Next come the Securities Commission Malaysia sustainable and responsible investment (SRI) sukuk framework and the green sukuk capital market. Equity or development finance sits beside the debt. Sukuk are Islamic investment certificates that evidence an ownership interest rather than a debt, and I use the term throughout. I set out the wider territory in Islamic finance for SAF first. Then I work through what each of those four sources asks of a developer. The question is therefore a documentation question as much as an appetite question.
I write this piece for developers and investors at any stage, from pre-feasibility to post-FID (final investment decision).
In short
- Four sources: Local Islamic banks and their Islamic windows. The SRI sukuk frame and the green sukuk capital market round out the list, with equity alongside the debt.
- Rules: We screen out Riba (interest), excessive uncertainty and harmful activity. Every structure therefore rests on real assets and shared risk.
- Precedent: Etihad Airways raised USD 600 million in 2020 through the first sustainability-linked sukuk in global aviation. Its terms carried binding emissions targets.
- Price: The yield advantage of a green instrument over a conventional one exists. The measured difference so far is 2 basis points.
- Gate: Scholar approval and a sufficient pool of compliant assets stop a deal before it reaches pricing.
In this article
What a Malaysian developer can actually draw on
Four pockets run at the same time. Balance sheet funding comes from local Islamic banks and the Islamic windows of conventional banks. Moreover, the Securities Commission Malaysia SRI sukuk frame gives a domestic issuer a published eligibility list. By contrast, the wider green sukuk capital market reaches institutional investors outside Malaysia. Equity or development finance sits beside the debt.
The demand side is what makes the pool relevant. ICAO has adopted a collective long-term global aspirational goal for net-zero carbon emissions by 2050. IATA has committed its member airlines to net-zero emissions from operations by 2050. In fact, IATA assumes that the majority of aviation’s decarbonisation comes from SAF. The Air Transport Action Group’s Waypoint 2050 analysis puts the cost of that transition at USD 4.7 trillion. The named instruments for SAF plants, airport green infrastructure and low-emission ground operations are project finance and capital markets. The pool behind them is deep. For example, total global Islamic financial assets surpassed USD 5 trillion in 2025. Global sukuk issuance reached USD 264.8 billion the same year.
What this means for you: capital is not the constraint. Which of those four pockets your file can satisfy is, and that comes down to structure, eligibility and proof.
The rules that shape every structure
Shariah (Islamic law) principles prohibit riba, excessive uncertainty (gharar) and investment in harmful activities. Meanwhile, each transaction must rest on real economic activity and risk sharing. That pushes a SAF file into a small set of forms. Most Shariah-compliant aircraft financings have relied on Ijarah (lease contract), Ijarah wa iqtina, Murabaha (cost-plus sale) and Sukuk al-ijara. Meanwhile, project construction typically starts with istisna’a (a contract to build an asset to specification).
Sukuk follow AAOIFI Shari’ah Standard No. 17. They are certificates of equal value representing undivided shares in tangible assets, usufruct and services. In addition, they can hold assets of particular projects or special investment activity. Two things separate a sukuk from a bond. A Shariah board composed of Islamic scholars with financial acumen must approve the legal documentation. Also, a sufficient amount of Shariah-compliant assets must underpin the structure. The structure typically carries assets of at least equal value to the principal raised. Some hybrid structures require tangible assets worth at least 51 percent of total portfolio value.
What this means for you: confirm an asset pool of the right size and character exists. Do this before you model a rate, or you will have no instrument to price.
Malaysia's own frame
The Securities Commission Malaysia introduced the Sustainable and Responsible Investment Sukuk Framework in 2014. Also, it remains the reference point for a domestic issuer. It lets you align with national standards or with ICMA’s Green Bond Principles. Those principles set the use of proceeds: how the issuer spends the raised money before you approach anyone. The eligible green categories are broad. They include renewable energy, energy efficiency, pollution prevention and control, and environmentally sustainable management of natural resources and land use. They also cover terrestrial and aquatic biodiversity conservation, clean transportation, and sustainable water and wastewater management. The list adds climate change adaptation, circular economy adapted products and processes, and green buildings meeting recognised standards.
The proof is on the market. The world’s first green sukuk came in 2017 from Tadau Energy. It raised MYR 250 million to finance a large-scale solar photovoltaic power plant. CICERO certified the project as a 50 MW solar plant. Malaysia ranked second in cumulative green sukuk issuance from 2017 to 2022, accounting for 20 percent of all issuance. By contrast, a 2015 handbook put Malaysia at approximately 60 percent of sukuk issuances globally. Policy guidance in centres such as Labuan IBFC links Maqasid al-Shariah with sustainable finance tools. That link is the doctrinal bridge a Shariah board will look for.
What this means for you: the published eligibility list is ready for your file. The work is mapping a SAF plant into those categories and building the reporting around it.
What the market pays and who is already buying
Global sukuk issuance rose to USD 264.8 billion in 2025, making sukuk the fastest growing segment of Islamic finance. Sustainable issuance reached USD 13.4 billion in 2023 against USD 9.4 billion in 2022. That was the seventh consecutive record year since the market’s inception in 2017. Meanwhile, overall sukuk issuance was USD 212.5 billion in 2023, up 8.7 percent against 2022. Cumulative sustainable sukuk from 2017 to the first quarter of 2024 reached USD 42.7 billion. Also, that quarter alone added USD 4.0 billion, 17.2 percent above the same quarter of 2023.
Issuers from Malaysia, Indonesia, the UAE and Saudi Arabia collectively raised 83.3 percent of the cumulative total. That covers issuance up to the first quarter of 2024. Green sukuk issuance reached a record USD 11 billion by the third quarter of 2024. Around 55 percent of investors intend to invest in green and sustainability sukuk in coming years. In addition, Islamic ESG funds held USD 6.9 billion of assets as at March 2023, up 6 percent. Lenders and investors increasingly scrutinise aviation exposure through an ESG lens. As a result, borrowers with credible decarbonisation strategies can access green or sustainability-linked products on more favourable terms. That is where equity for SAF in Southeast Asia prices the risk debt will not carry.
What this means for you: depth already exists in your region. The differentiator is the credibility of your decarbonisation plan, not the availability of buyers.
Demand and mandates
Two mechanisms sit behind the offtake (the contract under which a buyer takes the plant’s output) your project will sign. CORSIA operates as a global market-based mechanism. It requires airlines to purchase eligible carbon credits to offset growth in emissions above a baseline linked to 2019 levels. The requirement creates demand for abatement of every kind, sustainable fuel included. Alongside it, the capital market applies regional buying criteria: the ASEAN Green Bond Standards are aligned with the Green Bond Principles, include green bonds and green sukuk, and explicitly list fossil fuel power generation projects as ineligible.
Feedstock economics move with energy markets, and the sequence of policy tests is set out in SAF mandates.
What this means for you: test your offtake against a compliance buyer and a voluntary buyer at the same time, since your lender will ask what happens if only one of them survives.
What your file has to produce
Start with the eligible project list, checked against the Green Bond Principles environmental objectives: climate change mitigation, climate change adaptation, natural resource conservation, biodiversity conservation, and pollution prevention and control, then against the ASEAN exclusions. Then the process: confirm eligible project categories, obtain an external review before issuance, most commonly an SPO (second party opinion) published on the issuer’s website, manage proceeds with an external auditor verifying the tracking, publish annual allocation and impact reporting, and take a post-issuance review.
In aviation the impact report runs on fuel-efficiency data, SAF usage metrics and emissions-intensity performance. KPI (key performance indicator) calibration is where deals are won or lost: emissions intensity per revenue tonne kilometre, absolute emissions trajectories and SAF uptake percentages. The precedent is Etihad Airways in 2020, a USD 600 million transition sukuk, the world’s first sustainability-linked sukuk. Also, the first transition-labelled financing in global aviation, with terms tied to a 20 percent cut in emissions intensity of its passenger fleet by 2025, a 50 percent cut in net emissions by 2035 and net-zero carbon emissions by 2050. Asset-backed documentation, title transfer mechanics and true sale or beneficial ownership issues sit alongside, with the Cape Town Convention of 2001 on International Interests in Mobile Equipment in play. I set out the tests in SAF sustainability criteria.
What this means for you: pick the KPI you can audit every year before you pick the instrument, because the terms follow the metric and the metric is what a default looks like.
Pricing, tenor and the rest of the stack
The greenium (the yield advantage a green instrument can achieve over a conventional one) is real but small: in 2020 the National Mortgage Corporation of Malaysia issued a 3-year sustainability SRI sukuk that recorded a yield 2 basis points lower than its non-SRI sukuk. Against that, the market study lists its barriers plainly: absence of a clear taxonomy, lack of standardised regulation, transparency and reporting challenges, greenwashing risks, high costs from external certification and reporting mandates, a lack of qualifying green projects in certain regions, and limited investor awareness of sukuk and sustainability principles.
Route matters as much as price. Islamic finance supplied in connection with project financings has in practice often come through the Islamic windows of conventional banks rather than from standalone Islamic institutions, an observation from a 2016 source older than two years. SAF prices stay linked to conventional fuel and energy input costs. Therefore, tenor assumptions should be stress-tested against energy markets rather than set once. For the wider financing sequence I point to how to finance a SAF project, and for the label question to how Shariah and green taxonomies align.
What this means for you: treat the greenium as a bonus, not a business case; the bank route and the capital market route will differ more in speed and reporting load than in basis points.
How I would run this if it were my file
I would list the eligible projects before choosing the instrument, because the SRI frame. Also, the Green Bond Principles objectives decide what can be financed at all. I would put the Shariah board in the room before documentation is drafted, since board approval. Also, the asset pool requirement are the two gating items and neither can be cured at pricing. I would test the bank route and the capital market route in parallel: an Islamic window of an established bank can move faster, while a sukuk carries a fixed process of external review, listing and reporting. I would keep the aviation KPIs auditable and aligned with what buyers. Also, regulators already measure, the way the Etihad transition sukuk did. And I would read the instrument as one slice of the capital stack, because equity, bank debt and offtake still decide whether the file is financeable at all.
What this means for you: sequence the file in that order and the instrument choice becomes a consequence of your evidence rather than a bet on market appetite.
Sources
- Dentons, 30 June 2026.
- ICMA, Islamic Development Bank and LSEG, April 2024.
- UNDP and Kuwait Finance House, 2024.
- Norton Rose Fulbright, 22 September 2016 (older than two years; original published February 2010).
- Latham and Watkins, 2015 (older than two years).
Frequently asked questions
Is Islamic finance in Malaysia only about sukuk?
No. Sukuk are the capital market instrument, and global sukuk issuance rose to USD 264.8 billion in 2025, but the debt side also runs on structures such as Ijarah, Ijarah wa iqtina and Murabaha, the forms most Shariah-compliant aircraft financings have used, and project financings have often been supplied through the Islamic windows of conventional banks.
Do I need a Shariah board in place before I approach a lender?
You need it before documentation is final rather than after. The legal documentation must be approved by a Shariah board composed of Islamic scholars with financial acumen, a sufficient amount of Shariah-compliant assets must underpin the structure, and board approval asks that the business and assets of the obligor align with the objectives of Shariah.
What does the Securities Commission SRI sukuk framework change for a SAF issuer?
It gives you a published eligibility frame. Issuers can align with national standards or with ICMA’s Green Bond Principles, the eligible green projects cover renewable energy, energy efficiency, clean transportation, pollution prevention and control and the other listed categories, and the world’s first green sukuk was issued under a comparable Malaysian frame in 2017.
Can an Islamic window and a conventional bank finance the same project?
Yes, and the market already does it. A large share of Islamic finance supplied for project financings has come through the Islamic windows of conventional banks, with the intercreditor relationship between Islamic and conventional financiers governed by an intercreditor agreement.
Looking for Islamic capital in Malaysia for your project?
A short call is usually enough to see where your project stands.
If your file needs the institutions rather than the analysis, I run investor introductions for SAF and infrastructure developers across the region, matched to the stage you are at and the structure you have chosen.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.