We Connect Asia

SAF

Islamic Banks and SAF Lending: What Actually Changes in Your Credit File

10 min read  ·  Jun 2, 2026  ·  By Alex

islamic banks saf lending

The short answer is that the credit analysis barely moves while the contract set changes completely. Shariah principles prohibit interest (riba), excessive uncertainty (gharar) and investment in harmful activities, and require transactions underpinned by real economic activity and risk sharing. So the file you carry into final investment decision (FID) reads much the same; only the documents around it are rebuilt from different parts. That is why I open every discussion of Islamic banks lending SAF with the contract set rather than with the pricing. The parent note on Islamic finance for sustainable aviation fuel sets out the wider route; here I stay with what actually changes inside your credit file.

I read the file the way a credit committee does, and I flag where the Islamic route adds a step rather than a different goal.

In short

  • Credit test: the buyer contract, the capital stack and the technology review are the same in both routes; only the documents change.
  • Contracts: a manufacturing contract while the plant is built, a lease once it is complete, and agency or cost-plus sale forms elsewhere in the stack.
  • Screens: Shariah screening adds a negative list and a board approval on top of the ordinary credit review.
  • Funding: some of the money arrives through Islamic windows of conventional banks, so the contract that ranks lenders decides who enforces first.
  • Reporting: allocation of proceeds and impact reporting sit alongside fuel-efficiency data, SAF usage metrics and emissions-intensity performance.
Facebook
Twitter
LinkedIn

In this article

What changes when your lender is an Islamic bank

The relationship itself is the first thing that shifts. Islamic finance institutions and their customers do not sit in a conventional creditor and debtor relationship; the relationship involves the sharing in financial risks and rewards, and Islamic lenders are principally asset-based, so they bear some of the risks associated with ownership of the relevant assets (Norton Rose Fulbright, 2016, a source older than two years). On a fuel plant that shows up in the security package: the equipment, the lease and the title matter as much as the covenant package.

The ambition of the offer set does not shift at all. The same lender can still bring green loans or bonds to finance new-technology fuel-efficient aircraft, sustainability-linked facilities where margins step up or down based on emissions-intensity or SAF-uptake key performance indicators (KPIs), and project finance and capital markets solutions to support SAF plants, airport green infrastructure and low-emission ground operations (Dentons, 30 June 2026). What changes is how each line is documented, screened and reported.

What this means for you: I treat the Islamic route as a different drafting desk, not a different credit appetite, and I rebuild the documents before I revisit the pricing.

The contract set behind the loan

The most frequently used structures in the project finance sector of the Middle East have been the Istisna’a-Ijara structure, sometimes called a procurement structure, and the Wakala-Ijara structure (Norton Rose Fulbright, 2016). Fix the vocabulary early: an istisna’a is a contract to manufacture an asset to agreed specifications and deliver it by an agreed time for an agreed price; an ijara is a lease of an asset at an agreed rental; a wakala is an agency contract; and Murabaha is a cost-plus sale with deferred payment (Norton Rose Fulbright, 2016; ICMA, Islamic Development Bank and LSEG, April 2024).

In the parallel structure the borrower undertakes under the istisna’a to procure manufacture, delivery and construction of the plant and equipment, the construction contract passes through those terms, and the Islamic financiers make phased payments akin to draws. Title typically passes to them automatically upon transfer of title under the EPC or construction contract (Norton Rose Fulbright, 2016).

The ijara comes into effect upon project completion, usually as ijara-wa-iqtina’a, under which the lenders as lessor promise to transfer ownership of the leased asset to the borrower at the end of the lease or in stages. Maintenance and insurance, which would ordinarily fall to the owner and lessor, are performed by the borrower under a service agency agreement and recouped within the rental payments.

What this means for you: I pick the structure from the construction sequence and the asset it finances, and I let the credit terms follow from that choice rather than the other way round.

Where the money behind the loan comes from

A significant proportion of Islamic finance supplied for project financings has come through the Islamic windows of conventional banks rather than Islamic institutions (Norton Rose Fulbright, 2016). Where Islamic and conventional financiers are both in the deal, the Islamic financiers’ enforcement rights in relation to the assets are governed by an intercreditor agreement, which is the contract that ranks lenders lending to the same borrower (Norton Rose Fulbright, 2016).

The wider pool is large. Total global Islamic financial assets surpassed USD 5 trillion in 2025, and global sukuk issuances rose to USD 264.8 billion in 2025, making sukuk the fastest growing segment of Islamic finance (Dentons). The instrument menu is documented too: AAOIFI has specified 14 categories of permissible sukuk, and following its 2008 statement the most commonly used sukuk structures in the market are ijara, murabaha and mudaraba-wakala (Latham and Watkins, 2015, an older source).

What this means for you: I identify the actual funder behind an offer before I compare terms, because an Islamic window of a conventional bank and a standalone Islamic institution do not behave the same way when it comes to enforcement.

What stays exactly the same

The gates are unchanged: a credible offtake (the contract under which a buyer takes the plant’s output), a sized capital stack, a bankable technology and a management team that can build it. Project finance and capital markets solutions are the named instruments for SAF plants, airport green infrastructure and low-emission ground operations (Dentons), so the instrument may differ while the test does not. I set the gates out in the bankability note.

The market’s own pricing signals travel across both routes. SAF prices remain linked in part to conventional fuel and broader energy input costs, so tenor and margin assumptions read the same in a conventional credit paper and an Islamic one (Dentons). Lenders and investors increasingly scrutinise aviation exposure through an ESG lens, and borrowers with credible decarbonisation strategies can access green or sustainability-linked products on more favourable terms (Dentons).

What this means for you: I write the credit story once for both routes, because the offtake, the sizing, the technology and the team are what the committee actually debates.

The screens that can kill a term sheet

A negative screening excludes assets from sectors prohibited by Shariah principles, such as revenues from selling alcohol, gambling, adult entertainment and weapons, and the ASEAN Social Bond Standards exclude activities with negative social impact related to alcohol, gambling, tobacco and weaponry (ICMA, Islamic Development Bank and LSEG, April 2024). Islamic finance adds a second layer of screening on top of the ESG review rather than replacing it (Dentons).

Two further obligations sit on top of the ordinary credit review: legal documentation that needs to be approved by a Shariah board composed of Islamic scholars with financial acumen, and the availability of a sufficient amount of Shariah-compliant assets to underpin the sukuk structure. Typically the assets put forward are of at least equal value to the principal amount being raised, or in some hybrid structures the value of tangible assets amounts to at least 51 percent of the total value of the portfolio. Board approval also requires that the business and assets of the obligor align with the objectives of Shariah (ICMA, Islamic Development Bank and LSEG).

That alignment is why the two frameworks read well together: studies find Islamic financial institutions with stronger Shariah governance tend to exhibit higher ESG scores (Dentons). The project-level test for a fuel plant sits in the sustainability criteria note.

What this means for you: I run the negative screen and the asset pool check before a term sheet is drafted, because both can stop a deal that the credit analysis has already approved.

Documentation, title and the fights you should expect

Asset-backed documentation, title transfer mechanics and true sale or beneficial ownership issues are the recurring points, with the Cape Town Convention of 2001 on International Interests in Mobile Equipment in the documentation (Dentons). The mechanics run deep into the credit: after a default the financiers hold a purchase undertaking from the borrower, which is a form of acceleration, and title does not pass to the borrower until amounts owed are discharged in full (Norton Rose Fulbright, 2016).

Sukuk sit beside this bank debt as certificates of equal value representing undivided shares in ownership of tangible assets, usufruct and services or in the ownership of assets of particular projects or special investment activity, under AAOIFI Shari’ah Standard No. 17 (ICMA, Islamic Development Bank and LSEG). That definition is why a green sukuk label and a Shariah-compliant loan ask for the same asset story: see the green sukuk note for SAF.

What this means for you: I negotiate title, purchase undertakings and the Cape Town Convention position in parallel with the credit terms, because those are the points that decide who holds the asset when the file goes wrong.

Price, process and the rest of the stack

The greenium is real but small: in 2020 the National Mortgage Corporation of Malaysia issued a 3-year sustainability SRI sukuk that recorded a yield 2 basis points lower than its non-SRI sukuk (UNDP and Kuwait Finance House, 2024). On the instrument side, sukuk typically can be traded, listed and rated, and carry periodic distribution payments similar to coupons (ICMA, Islamic Development Bank and LSEG).

On the borrower’s side the barriers recorded by the market study are the absence of a clear taxonomy, lack of standardised regulation, transparency and reporting challenges, greenwashing risks, high costs from external certification and reporting mandates, a lack of qualifying green projects in certain regions and limited investor awareness of sukuk and sustainability principles (UNDP and Kuwait Finance House). For a sustainable aviation fuel project the aviation impact reporting that will be asked of you runs on fuel-efficiency data, SAF usage metrics and emissions-intensity performance (Dentons).

If you want the wider financing sequence, read how to finance a SAF project; the instrument side of that structuring is set out in sukuk structures for low carbon fuels.

What this means for you: I budget for the certification and reporting cost before I quote a margin, since those conditions are already inside the committee’s conditions list.

How I would run this if it were my file

I would take the credit story first and the contract set second, because the offtake, the sizing and the technology review are identical in both routes (Dentons). I would bring the Shariah board into the drafting early, since documentation approval and the asset pool requirement are gating items rather than signatures collected at the end (ICMA, Islamic Development Bank and LSEG).

I would check who is really funding: an Islamic window of a conventional bank behaves differently from a standalone Islamic institution, and the intercreditor agreement decides who enforces first (Norton Rose Fulbright, 2016). I would choose the structure from the construction sequence: istisna’a while the plant is being built, ijara once it is complete (Norton Rose Fulbright, 2016).

I would keep the KPIs on facilities measurable and aligned with what buyers and regulators already measure, and I would read the loan as one slice of the capital stack: equity, debt and the offtake still decide whether the file is financeable at all.

What this means for you: I run the credit first, the board approval second and the funder identity third, in that order, so that no drafting effort is spent on a structure the credit test has already cleared.

Sources

Frequently asked questions

Mostly no on substance and yes on form. You still prove the offtake, the sizing and the technology, while Shariah principles prohibit interest (riba), excessive uncertainty (gharar) and investment in harmful activities and require transactions underpinned by real economic activity and risk sharing (Dentons, 30 June 2026). Because Islamic lenders are principally asset-based, they also bear some of the risks associated with ownership of the relevant assets (Norton Rose Fulbright, 2016).

Under the istisna’a the borrower undertakes to procure manufacture, delivery and construction of the plant and equipment, the construction contract passes through those terms, and the Islamic financiers make phased payments akin to draws.

Because two obligations sit on top of the credit review: legal documentation approved by a Shariah board composed of Islamic scholars with financial acumen, and a sufficient amount of Shariah-compliant assets to underpin the structure, typically of at least equal value to the principal amount being raised (ICMA, Islamic Development Bank and LSEG, April 2024).

Yes, and it is documented. A significant proportion of Islamic finance supplied in connection with project financings has come through the Islamic windows of conventional banks rather than by Islamic finance institutions, and where both are in the deal the enforcement rights of the Islamic lenders are governed by an intercreditor agreement between them (Norton Rose Fulbright, 2016).

Want your credit file read the way an Islamic bank reads it?

A short call is usually enough to see where your project stands.

If you are holding a file before FID, I run that credit and contract review, and where the project needs Islamic capital I open the door through the investor introductions service.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles