Hydrogen Hubs in Asia: What I Check Before I Put a Project Next to One

10 min read  ·  Sep 12, 2025  ·  By Alex

hydrogen hubs asia

A port with a name, a pier and a press release can still have nowhere to send hydrogen. When I choose where to site a project that has not cleared final investment decision. This means meane the point at which a board commits capital, three things decide whether a hub. This means meane a place where the molecule is used, moved and bought at the same address, matters: nearby demand that consumes the molecule, transport options already built, and a financing anchor that has committed. I never call a port a hub just because a government named it one. Therefore, the label alone keeps a site off my shortlist. I read green hydrogen announcements constantly. Therefore, I built a short list I apply to hydrogen hubs asia before I book a single site visit.

This piece orders three things. First, what a hub is physically made of. Then, where the flows will actually go. Finally, what I refuse to accept as proof. I keep the three tests separate, so a strong answer on one never carries a weak answer on another.

Hydrogen hubs in Asia: the four tests at a glance

In short

  • Demand: Nearby buyers must consume the molecule in volume, on terms I can read in 2026, or the place is only a label.
  • Infrastructure: Conversion, meaning changing the molecule into another carrier, and transport must exist now, since most announced hydrogen pipelines are not in service in 2026.
  • Flows: In the 2050 scenario modelled in 2022, trade runs 55% by pipeline and 45% by ship, so an Asian site depends on shipping.
  • Money: Lanes are narrow, and more than 85% of spending in 2025 went to existing uses or hydrogen-based fuels.
  • Anchor: A national demand target justifies shared infrastructure, but only a committed buyer makes a site bankable.
Facebook
Twitter
LinkedIn

In this article

What I actually check before I call a port a hub

I apply three tests in order. First, co-located demand. Is there a user within a workable radius taking the molecule at a volume I can plan against? That means a firm offtake, in other words a buyer contractually obliged to take volume on agreed terms. Second, is transport already built and operating? Third, has a financing anchor committed capital to that address rather than to a study?

The mistake I see most is a hub announced where nobody nearby uses the molecule. A government names a port in 2026, an incentive scheme follows. Also, a developer sites next to it while the local refiner or chemical plant has no plan to buy. What moves early deployment is production placed next to pools of diverse potential users in 2026. A logo on a gate does not move it.

What this means for you: treat a government label as a search filter and nothing more. Before I spend on land or permits I want a named local consumer and an operating terminal or carrier route. I also want one party whose capital is already committed to that location.

The physical pieces that decide whether molecules can move

The IEA records in the trade and infrastructure chapter of the Global Hydrogen Review 2026 that announced hydrogen pipeline projects exceed 40 000 km by 2035 with only 9% of that length operational or committed in 2026, while operational and committed pipeline length grew by 70% since the previous edition.

Around 170 ammonia and 130 methanol port terminals were in operation in 2026. More methanol infrastructure is under construction, linked mainly to bunkering. Bunkering means fuelling a ship with fuel rather than provisioning it. For carriers I quote hydrogen equivalent, meaning the hydrogen content of a carrier counted back as hydrogen. Also, I start with green ammonia.

Construction has started in Japan on the first commercial-scale terminal for liquefied hydrogen imports as of 2026. For pure hydrogen at the point of use, shipping implies minimum costs of around 2 USD per kilogram in 2026. It also implies energy use above 10 kWh per kilogram, over 30% of hydrogen’s energy content.

What this means for you: I ask which carrier leaves my site and whether the receiving terminal exists in 2026 or only on paper. Ammonia means a network I can book; liquid hydrogen means a chain I am first to build.

Where the flows will actually go

The IRENA trade study of 2022 projects that about a quarter of global hydrogen demand could be traded by 2050. That is its 1.5 C scenario: 18.4 EJ per year, or around 150 Mt per year. Around 55% moves by pipeline and 45% by ship, mostly as ammonia. Europe would take 85% of pipeline trade, Australia would mainly supply the Asian market. Also, the top seven countries would represent 96% of exports and 86% of imports.

For an Asian site this reshapes what I optimise: pipeline trade concentrates in Europe. Therefore, my location competes to serve importers by ship. That puts the weighted average cost of capital. This means the blended return lenders and equity holders require, at the centre of my case. The same 2022 study expects resource-rich, low-capital-cost regions to take nearly 40% of world trade.

What this means for you: I do not shortlist a hub for proximity to a future pipeline. I shortlist it for a shipping route, a carrier my buyer accepts in 2026. Also, a capital cost I can carry to final investment decision.

What today's demand really looks like

The IEA executive summary of the Global Hydrogen Review 2026 records demand above 100 Mt in 2025. New applications are still a minor share of that total. Low-emissions production rose 20% in 2025 to almost 1 Mt. It passed 1% of global production for the first time in 2026. That base is the pool any hub here has to draw from.

The forward numbers are tighter. Announced supply for 2030 shrunk to 27 Mt in 2026, committed and strong-potential projects fell from 10 Mt to just above 6 Mt, and new offtake agreements were broadly unchanged in 2025 at around 1.7 Mt with only about 20% of newly signed volumes firm. I read my map of hydrogen projects in Southeast Asia against those numbers.

What this means for you: I size a hub against volumes I can contract, not against announcements. If the only demand I can document in 2026 sits inside a 27 Mt forecast, I am siting next to a forecast rather than a buyer.

Where the money concentrates, and what it refuses to fund

The IEA investment and innovation chapter of the same Global Hydrogen Review 2026 records capital spending of nearly 7 billion USD in 2025, nearly double 2024 and equal to 0.7% of global investment in energy supply. China accounts for more than 60% of committed electrolysis capacity by 2026 for 25% of estimated investment. Meanwhile, europe holds less than 20% of that capacity for 45% of investment.

Over 85% of investment in 2025 targets existing hydrogen uses or hydrogen-based fuels. Therefore, capital is not chasing a new location for its own sake. International public finance in emerging economies reached around 3.3 billion USD of cumulative commitments by the first quarter of 2026 against around 650 million USD at project level, the gap my site has to cross. I price against regional cost work for 2026 before anything else. I also follow where low-carbon fuels investment flows to see which chain a funder will underwrite.

What this means for you: I find the funder’s lane before I look at a plot. If the chain I want sits outside the lane that took more than 85% of spending in 2025, I need an anchor buyer to carry it.

What an anchor buyer's policy changes for my site

Japan’s Basic Hydrogen Strategy of 2023, issued by METI, sets supply targets of up to 3 million tonnes per year by 2030, 12 million tonnes per year by 2040 including ammonia, and about 20 million tonnes per year by 2050, alongside cost targets of 30 yen per normal cubic metre in 2030 and 20 yen per normal cubic metre in 2050. A stated demand of that size turns an import port into a destination, because it justifies terminals, shipping capacity and shared plant that no single buyer would build alone.

What it does not do is buy my molecule. A target is not a contract. Also, a cost target for 2050 is an ambition rather than a price I can put in a 2030 model. The same policy notes that 26 countries and economies had a hydrogen strategy by 2022 after the first one was filed in 2017, so the label anchor buyer is common while contracted volume stays rare.

What this means for you: I use a national target to argue for shared infrastructure and to open a conversation, then I underwrite the site on an offtake term sheet I can read rather than on the target itself.

How I shortlist three hubs for a real project

I ask four questions in order: who consumes within a workable radius, which carrier leaves the site, which certification scheme the buyer accepts, and who has committed capital. I then test each answer against what the site can physically handle, whether that is ammonia, hydrogen-based e-fuels or something else, before I spend money.

  • Consumers: if no named offtaker sits inside a radius I can serve in 2026, the hub leaves my list whatever its label says.
  • Carrier: if the product that leaves my site has no operating terminal in 2026, I change the product rather than the address.
  • Capital: if no party has committed money to that location, I park it as a watch item and stop spending.

What this means for you: I run the four questions on paper first and keep two or three candidates alive until an offtake term sheet settles it, because the paperwork, not the pier, decides.

The order I work in

If every announced project materialised, trade would cover over 40% of announced volumes by 2030 in the 2026 view, against less than 8% backed by operational, construction or committed projects. The same arithmetic applies to supply: 22 Mt of announced potential could lose any chance of operating by 2030 without investment decisions by early 2027.

So I work demand first, carrier second, capital third. I confirm who buys and on what terms, then I test whether the carrier leaves through infrastructure that exists in 2026, and only then do I price the financing anchor. A hub that clears those three gates is where the project goes.

What this means for you: sequence the work and the hub stops being an argument. Run the gates in order and you will know within weeks whether a location is a real option or a label waiting for money.

Sources

Frequently asked questions

Co-located consumption, a conversion or transport option that is already built, and committed capital. In 2026 a name and an incentive scheme are not enough: I want a nearby user taking volume on terms I can read, infrastructure that exists rather than announced, and one party whose money is already committed to the address.

Around 170 ammonia terminals and 130 methanol terminals are in operation in 2026, while announced hydrogen pipelines exceed 40 000 km by 2035 with only 9% operational or committed in 2026, and underground storage could reach 11 TWh by 2035 with just over 7% at final investment decision in 2026. The carrier network is real; the pure hydrogen network is thin.

Not on the announcement alone. I require an offtake I can read, a carrier my site can actually handle and a financing anchor, because committed and strong-potential supply for 2030 fell to just above 6 Mt in 2026 while the announced pipeline stands at 27 Mt in 2026. That gap is where siting risk lives.

I shortlist on demand first, then carrier, then certification, then capital, and I keep two or three candidates until an offtake term sheet settles it in 2026. I do not name a winner in advance, because one buyer converting an announcement into terms I can underwrite changes the ranking.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are weighing a site against a hub in this region, I do that work with you through one of my strategic partnerships engagements: demand first, carrier second, capital third, and a written verdict you can take to your board.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia