Indonesia Hydrogen Policy: What the 2023 Strategy Changes for a Project
10 min read · Dec 2, 2025 · By Alex
I read the Indonesian hydrogen rulebook against what a developer needs before committing capital, and I begin from the hydrogen, PtX and e-fuels hub that holds this branch of my research. Indonesia published its national hydrogen strategy on 15 December 2023 and issued three national standards in 2024, yet as at October 2024 there was still no government regulation or policy covering hydrogen development schemes, so the strategy gives a project a reference framework, a set of standards and named state pilots, but not an enforceable right to produce, inject, sell or export hydrogen. An Indonesia hydrogen policy question at pre-investment screening is therefore about sequence, not ambition.
I now order seven things: what the strategy says, what regional demand looks like, what changes for one project, who signs first, what the investment side sees, what still must be written, and the checks I run. Each section closes with the consequence I would carry into a model.
In short
- Strategy: the national document was launched on 15 December 2023 and states intent, not a right to produce or sell hydrogen (2023).
- Standards: three SNI standards were published in 2024 while the KBLI code and the government regulation stayed in draft (2024).
- Demand: Southeast Asia consumed 4 Mt of hydrogen in 2024 and Indonesia alone held 35 per cent of it (2024).
- Buyers: state entities are the first expected movers, with transport from 2031 and industry from 2041 (2023, 2024).
- Capital: the state targets 25.2 billion USD (395.58 trillion rupiah) of private green hydrogen investment by 2060, and the cost of capital is the barrier named first (2060, 2025).
In this article
What a national hydrogen strategy gives you
A national hydrogen strategy is the document in which a government states where it wants hydrogen to be used and by when, and a roadmap sequences the actions behind it. A government regulation is the binding text that creates rights and duties, and without it a strategy cannot be enforced by a project. A national standard is a published technical specification, issued in Indonesia as SNI, and a standard industrial classification code is the KBLI entry that determines how a business is registered and supervised. A pilot project is a first demonstration, not a commercial facility, and an offtaker is the party that buys the output. Bankability is the quality that makes a project financeable on its own cash flows, a certification scheme records how a molecule was made, and a final investment decision is the point where the sponsor commits the capital. A strategy tells a developer what a country intends; a regulation tells it what it may do (2023, 2024).
What this means for you: I treat strategy as context and regulation as permission, and I keep anything that needs an enforceable right outside the base case.
What Indonesia published
According to Indonesia’s national hydrogen strategy presentation of October 2024, the strategy document was launched on 15 December 2023 on three strategies, supporting renewable energy development, meeting the decarbonisation target and using hydrogen as an export commodity, with four sectors of use, industry, transportation, power generation and export, inside about 3.7 TW of renewable potential (2024). A national hydrogen and ammonia roadmap was under preparation with a Jakarta refuelling station pilot study, storage in pressure tanks up to 200 bar, distribution in pipelines up to 200 bar and 12 potential refuelling station locations, while Government Regulation No. 14/2012 was being revised so electricity from hydrogen power plants can be purchased (2024). Three SNI standards were published in 2024, on hydrogen fuel quality, refuelling stations and hydrogen safety, alongside a draft government regulation, a KBLI code being finalised and technical committee 27-11 Hydrogen Technologies. The same presentation records that no regulation covers hydrogen development schemes, that green hydrogen production cost is still not competitive, and that supply remains dominated by coal and natural gas, with renewable electricity price and electrolyser price named as the main cost factors. Indonesia has written the technical rules faster than the commercial ones (2024).
What this means for you: I set the green hydrogen guide beside this record and I model the technical rules as usable, the commercial rules as unfinished.
What the regional demand looks like
According to the December 2025 Southeast Asia briefing, regional hydrogen demand was 4 Mt in 2024 with 5 countries holding a national strategy: ammonia took 49 per cent of that demand, refining 31 per cent and methanol 20 per cent, and Indonesia alone accounted for 35 per cent of it (2024). Announced projects in the region equal 12 per cent of current regional demand, and only 6 per cent of announced capacity had reached a final investment decision (2025). Nearly 11 Mtpa of regional potential sits below 6 USD/kg by 2030, mostly in Indonesia (2030). No certification scheme is in place in the region, with work under way in three countries, and a high cost of capital is named as the main barrier (2025). Globally, 7 Mtpa of offtake was announced between 2021 and 2025 of which only 1.6 Mtpa was firm, against 6.6 billion USD of development finance lending (2025). The largest demand pool sits in the country with the least finished rulebook (December 2025).
What this means for you: I hold the regional demand case and the Indonesian rulebook case as two separate inputs, because they do not move together.
What changes for a project
According to the Green Hydrogen Organisation’s Indonesia country page, demand grows from 2030, transport takes on hydrogen in 2031 and the industrial sector in 2041 to replace natural and fossil gas in high-temperature heat, with the country starting on low-carbon hydrogen and shifting to green when the economics compete. The nearest-term effect is that Pertamina, Pupuk Indonesia and PLN can move to pilot projects producing and consuming low-carbon hydrogen (2024). Indonesia consumes about 1.75 million tonnes a year today, mostly for fertiliser, ammonia and refining, against about 3,689 GW of new and renewable potential of which only 0.3 per cent is used. A Pertamina forecast runs from 0.9 to 8 million tonnes a year by 2040, and an IEA forecast points to about 800 petajoules, roughly 5.6 million tonnes, with about 220 TWh of hydrogen electricity in 2060. Transport moves from 26,000 barrels of oil equivalent, 0.04 TWh for road trucks, in 2031 to 52.5 million barrels, 89 TWh, in 2060, and industry from 2.8 TWh in 2041 to 79 TWh in 2060, with metal, ceramics and paper reaching 29 TWh by 2060. The schedule is published, and every year on it depends on rules that are still being drafted (2023, 2024).
What this means for you: I take my Southeast Asia cost comparison and treat these volumes as scenario inputs, never as contracted demand.
Who is expected to sign first
According to the ISEAS study of May 2025, no large commercial green hydrogen facility is in operation in Southeast Asia as at 5 May 2025, with pilots and initiatives under way notably in Malaysia and Indonesia. The ASEAN region will account for 25 per cent of global energy demand growth between 2024 and 2035. A joint development agreement was signed on 21 October 2024 between Sembcorp and PT PLN EPI and presented as the largest green hydrogen project in Southeast Asia. The study lists five regional constraints: electrolyser cost and reliability; market mechanisms, regulatory frameworks, safety and transport infrastructure; harmonisation of standards and certification; investment in renewable capacity; and competition from other low-carbon solutions. Two sit at developer level: securing offtake agreements, and competition from data centres for electricity supply. In this market the first signature comes from a state buyer, not from a merchant counterparty (May 2025).
What this means for you: I model the financing route for a hydrogen project with a state or utility offtaker in the base case and no merchant volume.
What the investment side sees
According to the 2025 review’s five key questions, firm offtake agreements add up to less than 2 Mtpa, about 5 per cent of the potential 2030 production of announced projects. Only 9 per cent of announced projects worldwide have secured committed investment, against 0.5 per cent in emerging economies. The cost of capital can reach 15 per cent in emerging economies, three times the level in advanced economies, and the electrolyser stack is only 15 to 20 per cent of installed investment. On the Indonesian side, the government targets 25.2 billion USD (395.58 trillion rupiah) of private green hydrogen investment by 2060, and Pertamina has already allocated 11 billion USD to its green energy development targets (2060).
What this means for you: I rank my Southeast Asia investment comparison on committed capital and offtake quality, not on announced capacity.
What still has to be written
According to the Malaysian roadmap’s ASEAN benchmark, Malaysia, Indonesia, Brunei and the Philippines all appeared with ‘None’ for policy, roadmap, strategy and national target when that document was published on 5 October 2023. The rest of my checks dates as follows. The incentives suggested by the strategy include tax credits, a tax holiday and research grants, and none of them is binding or tied to a specific policy (2024). New KBLI codes for low-carbon hydrogen were due to roll out in 2025 (2024). Three national standards were already published in 2024 (2024). A government regulation for hydrogen was still only a draft (2024). The region still has no certification scheme in place, with work in three countries (2025).
What this means for you: I read my grants and incentives map as an upside case only, because in this jurisdiction the instruments are announced rather than enacted.
The four things I check before I model Indonesia
First, the binding text: a strategy was launched on 15 December 2023 while, in October 2024, no government regulation covered hydrogen development schemes (2023, 2024). Second, the standard: three SNI standards were published in 2024 while the KBLI code and the government regulation were still being drafted (2024). Third, the buyer: state entities were expected to move to pilot projects, and demand grows only from 2030, with transport in 2031 and industry in 2041 (2023, 2024). Fourth, the certification and the capital: no scheme is in place in the region with work in three countries, and the cost of capital is the barrier named first (2025).
What this means for you: I will not model Indonesia as a bankable jurisdiction until the first two checks clear, and until then I hold it as a pipeline market with published targets and state pilots.
Sources
- IEA, Global Hydrogen Review 2025, Southeast Asia, 9 December 2025 https://iea.blob.core.windows.net/assets/745a259b-9cb7-4e1d-9ba1-a8b63d1eaae8/GHR2025_SEA_Webinar.pdf, 2025.
- Ministry of Energy and Mineral Resources of Indonesia, Indonesia’s National Hydrogen Strategy, presentation of 22 October 2024 https://henca-tokyo.metro.tokyo.lg.jp/2024/data/Ministry_of_Energy_and_Mineral_Resources_of_the_Republic_of_Indonesia.pdf, 2024.
- Green Hydrogen Organisation, Indonesia country portal https://gh2.org/countries/indonesia, 2026.
- ISEAS Yusof Ishak Institute, Green Hydrogen in Southeast Asia: Connecting National Strategies with Public Support, ISEAS Perspective 2025 No. 33, 5 May 2025 https://www.iseas.edu.sg/wp-content/uploads/2025/03/ISEAS_Perspective_2025_33.pdf, 2025.
- IEA, Global Hydrogen Review 2025, Five key questions about hydrogen https://www.iea.org/reports/global-hydrogen-review-2025/five-key-questions-about-hydrogen, 2025.
- Malaysia, Ministry of Science, Technology and Innovation, Hydrogen Economy and Technology Roadmap, 5 October 2023 https://www.mosti.gov.my/wp-content/uploads/repository/penerbitan/2023/Hidrogen%20Economy%20&%20Technology%20Roadmap.pdf, 2023.
Frequently asked questions
Does Indonesia have a national hydrogen strategy?
Yes. It was published on 15 December 2023 by the energy ministry and built on three strategies, supporting renewable energy development, meeting the decarbonisation target and using hydrogen as an export commodity, plus four sectors of use, industry, transportation, power generation and export. A national hydrogen and ammonia roadmap covering a Jakarta refuelling station pilot study was still under preparation at the time (2023, 2024).
Is Indonesia's hydrogen policy binding on a project?
Not yet. As at October 2024 no government regulation or policy covered hydrogen development schemes, so a project cannot enforce the strategy. The incentives the strategy lists, tax credits, a tax holiday and research grants, were suggestions rather than enacted measures, and a government regulation for hydrogen was still only a draft (2024).
When does hydrogen demand in Indonesia actually start?
Demand is forecast to grow from 2030, with transport taking on hydrogen in 2031 and the industrial sector in 2041, replacing natural and fossil gas in high-temperature heat. Against that, current consumption is about 1.75 million tonnes a year of hydrogen, used mostly as a feedstock for fertiliser, ammonia and refining (2023, 2024).
What has to be in place before a project can be financed?
Four things: a binding text, a published standard, a named buyer and a certification route. Three national standards were published in 2024 while the government regulation was still a draft in 2024, and in 2025 no certification scheme was in place in the region, with work under way in three countries (2024, 2025).
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are screening this market before a final investment decision, I assemble the binding text, the standards evidence, the named buyer and the certification route into one model, and I offer project finance support for exactly that work.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.