We Connect Asia

Category: Power-to-X

Engineering, procurement and construction is more than half of electrolyser installation cost: how the EPC contract, guarantees and insurance split the risk.
Commercial crackers handle 1 to 1,500 kg of hydrogen a day at 850 to 1,000 degrees C with 30 to 60 per cent efficiency: what maturity looks like.
A flexible ammonia design runs down to 5 per cent of nominal power and reheats its reactor in 15 minutes; commercial plants are built for steady state.
Singapore licenses methanol as marine fuel from January 2026, Japan targets 10 per cent SAF by 2030, Korea orders e-methanol ships: what is real demand.
Water enters an electrolyser as feedstock, as cooling and as a permit condition: three volumes, three contracts, one siting decision.
Power-to-liquid turns renewable power, water and CO2 into drop-in fuels. I explain the chain, the cost drivers and what investors check.
The Fischer-Tropsch reactor needs carbon monoxide, not CO2: you get it from reverse water gas shift or from high temperature co-electrolysis.
Four hydrogen myths, tested against published figures: less than 1% of demand, 1.7 Mt of offtake and one step still at readiness level 6.
Methanol synthesis for PtL accepts CO and CO2, runs at 200 to 300 degrees Celsius and 50 to 100 bar, and its jet approval is still pending.